HOME  /  PROJECT PHASES

Project Phases

4
Development Phases
125+ ha
Project Area
Limbe
Mondoli Corridor, Cameroon
SW
Southwest Region

Four Phases of
Development

Enrich Resort City™ is delivered in four carefully sequenced phases — each building the foundation for the next, from technical validation through to full operational launch.

1
PHASE ONE
Technical Validation
The first phase establishes the technical foundation of the entire development — ensuring that the site, environment, and engineering requirements are fully understood and validated before construction begins.
  • Environmental impact assessments
  • Engineering studies & feasibility analysis
  • Site surveys & topographic mapping
  • Master planning & architectural design
  • Regulatory approvals & permits
2
PHASE TWO
Infrastructure Preparation
Phase 2 puts in place all the essential systems and networks that will power, connect, and sustain the resort city — the invisible backbone upon which all future development depends.
  • Energy systems & solar infrastructure
  • Water supply & water management infrastructure
  • Telecommunications & digital connectivity
  • Road development & site access networks
  • Utility distribution systems
3
PHASE THREE
Construction
The third phase brings the resort city's built environment to life — constructing the hospitality, residential, commercial, and leisure assets that will define Enrich Resort City™ as a destination.
  • Resort hotel construction
  • Residential development
  • Commercial & retail infrastructure
  • Leisure & recreational facilities
  • Landscaping & public realm
4
PHASE FOUR
Operational Launch
The final phase transitions Enrich Resort City™ from a development project to a living, operating destination — welcoming guests, residents, and businesses while integrating into the national tourism network.
  • Hospitality operations commencement
  • Tourism activities & programming launch
  • Residential community activation
  • National tourism network integration
  • Commercial & business district opening

A Sequenced Path
to Completion

Each phase of the Enrich Resort City™ development is designed to build progressively on the last, creating a clear and structured path from initial validation to full operational readiness.

PHASE ONE
Technical Validation
Comprehensive environmental assessments, engineering studies, and site surveys establish the technical foundation for all subsequent phases, ensuring the development proceeds on the strongest possible basis.
PHASE TWO
Infrastructure Preparation
Energy systems, water infrastructure, telecommunications networks, and road development are established — creating the connected, sustainable backbone that will support the entire resort city.
PHASE THREE
Construction
Resort hotels, residential communities, commercial zones, and leisure infrastructure are constructed across the 125+ hectare site, transforming the Limbe–Mondoli corridor into a world-class destination.
PHASE FOUR
Operational Launch
Enrich Resort City™ opens its doors — with hospitality operations, tourism activities, and programming fully activated, and the project integrated into Cameroon's national tourism network.
Q3 2023
Master Plan Completion
Vavaki Architects delivers the full 125-hectare master plan — including all six zones, infrastructure layout, phasing strategy, and architectural design guidelines.
Q1 2024
Capital Raise — Phase 1 Launch
Investment prospectus launched internationally. Makinen Suisse SA leads investor roadshow in Geneva, London, Dubai, and Douala. Phase 1 funding round opens to accredited investors.
Q3 2024
Site Preparation Begins
Ground-breaking ceremony attended by Government officials, community leaders, and investors. Site preparation, land survey finalisation, and primary access road construction commences.
Q2 2025
Core Infrastructure & Energy
Primary utilities network installed. Supernova Energy completes Phase 1 solar array construction. Water treatment and distribution systems operational. Construction of flagship hotel commences.
Q4 2025
Beach Club & Promenade Opens
The resort's first guest-facing venue — the beach club and waterfront promenade — opens to the public, marking Enrich Resort City's first operational milestone. Pre-opening bookings begin.
Q2 2026
Flagship Resort Hotel Opens
The 200-key flagship hotel — operated under the Marriott brand — officially opens. Full suite of dining, wellness, and leisure amenities operational. Phase 1 residential village handovers begin.
Ready to be
Part of This Journey

Enrich Resort City™ presents a rare opportunity to participate in the development of Central Africa's most ambitious integrated resort destination. We welcome enquiries from investors, developers, and strategic partners.

Investment Opportunities Enquire Now
RESORT DEVELOPMENT
Hotel and resort infrastructure across the Limbe–Mondoli development site
RESIDENTIAL REAL ESTATE
Residential properties and lifestyle communities within the resort city
TOURISM INFRASTRUCTURE
Tourism and leisure infrastructure supporting the destination's visitor experience